Public Safety Building Construction Gallery #3

These photographs were captured to show progress on the construction of the Public Safety Science Building in June 2009.

Earlier stages may be viewed in Public Safety Building Construction Gallery #1 and #2.

PSS sign wall

Framing in the locker room - first floor

Looking north from the open bay

Steel work continues on the PSS Building

Second floor - looking west to the LS Building

Second floor slab poured - looking southwest

The open bay from the second floor

Topping Out remembered

Up on the roof - training platform

Excavation begins for the 10,000 gallon water tank

Water tank installation - bottom half of tank

Water tank installation - first chamber separator installed

Water tank installation - setting up for the second chamber

Water tank installation - second chamber separator installed

Water tank installation - unhooking from the crane

Water tank installation - the top half of the tank

Water tank installation - lining up

Water tank installation - tight fit

Water tank installation - letting her down

Water tank installation - TGIF: Ten-thousand Gallon Install on Friday!