Life Sciences Building Construction Gallery #6

These photographs were captured to show progress on the construction of the Life Sciences Building in October 2008. Earlier stages may be viewed in Life Sciences Building Construction Galleries #1, #2, #3, and #4, #5 and the Life Sciences Building Topping Out Gallery.


SW Corner of LS Bldg


LS110 Patio outside the Green Bean Cafe


Cafe Space in the LS Bldg.


NW Corner of the Cafe


Coffee Bar in the LS Bldg.


Looking out from the Cafe


Looking down on the Cafe from the Mezzanine


"Sticky Space" in the First floor corridor


Nurisng Practice Lab (LS 110)


Nursing Pactice Lab (LS 110)


East side corridor on Second floor


Phil Fernandez' Office on Second floor


A&P Lab (LS 309)


A&P Lab (LS 309). Two projectors/ceiling camera


Field Biology Lab (LS 327). Reef Aquarium


Statistics Lab (LS301)


Life flourishes in the Prep Room (LS 304)